Yarn spinning is a process of making or converting fiber materials into yarns. It is a complex branch of textile. Here the task of quality control starts from the raw material. At first when the raw cotton arrives, the lab boys collect samples from each bale and give respective numbers to each bale. Then the samples are tested in H.V.I. machine. From the obtained results, the bales are categorized in suitable categories for bale management and stored in the warehouse. Then the raw cotton is fed to the blow room through the bale management system. The bale management system is a vital task of the Quality Assurance department.
In blow-room, the fibers are opened and cleaned by beaters. Here if over beating takes place then there is a chance of fiber damage. So, the QA department tests cotton sample before and after every beating position to check the cleaning efficiency and fiber damaging. From there, necessary actions are taken. Different wastes that are collected at the fiber deposition plant of blow room are also studied to assure proper removal of trash particles as well as least possible wastage of cotton fiber. Also the QA department monitors the setting and performance of the contamination separator of the blow room.
Blowroom |
Carding machine |
Draw frame |
The Comber is a very crucial machine. Its performance plays a vital role on the quality of the combed yarn. So, the performance of the comber is assessed by testing the material before and after it. From there the nep removal efficiency of the machine is determined. Also the noil is tested to see whether long fibers are being wasted during the processing. From there, the necessary changes in the setting of the machine is carried out. The grain/yd of combed sliver is checked once per shift. The combed sliver is also tested once per shift in USTER-5 to determine U%, CV% etc and any periodic faults from the spectrogram.
Comber machine |
In case of testing of carding, breaker draw frame and finisher draw frame, a schedule is maintained so that all the machines are tested within a fixed period of time.
In simplex, the hank is mainly tested once per shift. Also the roving is tested in the USTER-5. A schedule is maintained so that all the spindles of simplex machines are tested over a period of time.
Simplex m/c |
Ring frame |
The moisture content in the yarn packages after heat setting are also tested by the QA department. Thus the proper time of heat setting can be maintained to deliver yarn with required amount of moisture content.